Handling instructions

Pipes should be kept on an even surface while storing. They should be properly supported and should not be stacked for heights more than 1.5m for longer durations.

While laying big pipelines provisions should be made for expansion joints, airvents and proper anchorage.

Pipes of fittings should not be cleaned with solvent cement.

Quality of solvent cement plays an important role and hence it is recommended to use good quality solvent cement only. For large diameter and higher class pipes (6 kgf/cm2 and above) always use heavy duty solvent cement,very old, hard semi-fluid solvent cement should not be used.

Consumption of solvent cement

Diameter of pipe (mm)

20

25

32

40

50

63

75

90

110

140

160

180

200

225

250

280

315

355

400

450

Appr. No of joints which can be made per liter of solvnet cement

324

270

225

180

130

125

103

79

54

36

27

25

15

12

9

7

5

3

2

2

Joining instructions

Cut the pipe as square as possible, please ensure that fitment of pipe with socket of fitting is correct.

Total length of insertion of socket shall be marked on pipe (for most of the cases the pipe inserted should be up to the marked line and in no case shall be less than 2/3rd of the pipe end up to the marked line)

The pipe and the socket should be clean and dry. Dust, oil, water, grease etc. should be wiped out with dry cloth or cleaner with from the surfaces to be coated with solvent cement.

Roughen the outside of the pipe and the inside of the socket using sand paper of piece of hacksaw blade up to the entry mark. Stir adhesive i.e. solvent cement throughly.

Apply a thick coat of solvent cement using a flat clean brush evenly on the sides of the socket mouth for full length of insertion and then on outside of the pipe end up to the marked line.

After application of solvent cement, insert the pipe with in one minute in to the socket. Hold the joint for few seconds and ensure that pipe does not come out of the fitting. Wipe off extra cement. Let it dry. With in 24 hours, your supreme rigid PVC pipes are ready for use.

In case of big pipeline projects, it is recommended to refer our installation guide.


JAINCO PIPES PVT. LTD.

Contact Us

( *represents compulsory fields )

Tips on getting accurate quotes. Please include product name, order quantity, usage, special requests if any in your inquiry.



Registered Office

Best Sky Tower Netaji Subhash Palace Pitampura Delhi
Phone No. - 011- 27351555
Opp Petrol Pump, Novelty Road, Karnal - 132001, Haryana, India
   Call Me Free Send SMS Send Inquiry
Key Personnel
Mr. Surinder Jain (M.D)
Mr. Ankit Jain (Director)
Mr. Mayank Jain (Director)
Delhi Office : 900/9Th Floor Best Sky Tower F-5, Netaji Subhash Place PitamPura Delhi-35
Trust Stamp
Product Showcase